Public Works / Site Work
Rockefeller Park Playground Replacement Netting
Battery Park City Authority - New York, NY
Removal and disposal of old playground netting. Finish and install new netting including Cargo Nets, Chase Bridge and Overheard Netting. Furnish and install rope wrapped cable and mesh.
Kowsky Plaza Trellis Removal
Battery Park City Authority - New York, NY
Scope of Work included all required general contracting services for the removal, transport and storage of a wooden trellis, benches and section of planter bed. Trellis sections were meticulously numbered and ordered for eventual reassembly.
Pier A Flue Venting System Replacement
Battery Park City Authority - New York, NY
Removal of existing and damaged boiler flue piping and replacement of new piping. Installation of new steel protection grating and walkway. Re-aligning of glycol lines. Boom lift for roof access to replace existing roof stack.
Preliminary Playscape Activation
Battery Park City Authority - New York, NY
Greenway USA installed synthetic turf including, fall attenuation pad, drainage layer, geotextile fabric, and synthetic turf and edging. Included was the installation of two (2) Printed Film Areas on both sides of the turf installation.
New York State Office of General Services
Shirley Chisholm State Office Building - Brooklyn, NY
Complete gut renovation of the entire 11th and 12th floors of state office building. Buildout of new walls, flooring, ceilings. MEP Package and installation of new furniture systems throughout the space.
Exterior Lighting and Security Upgrade - Albert Einstein College of Medicine
Bronx, NY
Excavation and installation of poles, pole bases and related conduit and power wiring. Heavy rock excavation was encountered and the penetration/waterproofing of Forchheimer Building foundation was required to secure new power for the lighting and low voltage cabling for the security cameras source from basement of building. New security cameras were installed on new light poles to allow Einstein Security a better view of area prone to crime. Site was regraded and landscaped.
Culvert Replacement for Department of Environmental Conservation
Lake Eaton, Hamilton County, NY
Replacement of three existing 24-inch, 30 foot long HDPE culverts with a 2x8x24’ H20 rated precast culvert. Scope of work included an upstream temporary dam, excavation and removal of the existing roadway and culverts, stream bed leveling, installation of the new box culverts and backfill and compaction, and finally the installation of new timber guiderails.
Wayfinding Paver Installation for Battery Park City Esplanade
Battery Park City Authority - New York, NY
Removal of existing pavers along .5 Miles of the Battery Park City esplanade and installation of new Wayfinding Signage Pavers at BPCA managed locations.